Taskee vs ClickUp: 60 MB against 10 GB on the free plan

ClickUp’s Free Forever plan gives 60 MB of storage in total. Taskee gives up to 10 GB — roughly 170 times more. ClickUp packs far more into that free tier: 5 Spaces, 3 whiteboards, a form and 100 automation runs, though Gantt charts and dashboards are trial-only and native time tracking starts on the paid Unlimited plan. Taskee has fewer features and no storage arithmetic to do first.

Pricing and limits verified: 2 September 2026

FeatureTaskeeClickUp
Free plan — usersUnlimitedNot capped by seat count
Free plan — storageUp to 10 GB60 MB
First paid tier, per user/mo (annual)No paid tier — the product is free$7 (Unlimited)
Kanban boardYesYes
Native time trackingYesOn Unlimited ($7/user/mo annual)
ReportsYesDashboards — trial only on Free
Gantt / timelineNoTrial only on Free; Gantt charts on Unlimited
Automation rulesNoYes — 100 runs/month across 5 active rules on Free
Native integrationsNo connectors; REST API, 140 endpointsUnlimited integrations from the Unlimited plan
Native mobile appNo — mobile browser onlyYes — iOS and Android
Custom roles and permissionsYesUnlimited custom roles on Enterprise

Source: clickup.com/pricing

Where Taskee is stronger

  • Storage: up to 10 GB against ClickUp Free’s 60 MB — about 170 times more, with no seat cap on either side.
  • Time tracking without a paid plan. In ClickUp, native time tracking is listed on Unlimited at $7 per user per month; in Taskee it is part of the free product — see time tracking.
  • Nothing is trial-only. Taskee’s reports are permanent, not gated behind a countdown the way ClickUp’s free Gantt charts and dashboards are.

Where ClickUp is stronger

  • Automation even on Free: 100 runs a month across 5 active rules. Taskee has zero automation rules.
  • 5 Spaces, 3 whiteboards and a form builder on the free plan — a wider free feature set than Taskee ships at any price.
  • Unlimited is $7 per user per month billed annually ($10 monthly), and it is where Gantt charts, unlimited storage, unlimited integrations and native time tracking arrive.
  • Built to replace several tools at once; Taskee is a single-purpose tracker by design.

Who should choose Taskee

  • The team stores real files — screenshots, documents, attachments — and 60 MB will not survive week one.
  • Boards and tracked hours are enough; nobody needs Spaces, whiteboards or a form builder configured first.
  • Gantt charts and dashboards are not needed, so a trial-only feature is not a loss.

Free for unlimited users, up to 10 GB. No paid tier, no trial countdown.

Who should choose ClickUp

  • The team wants automation, whiteboards and several views without paying yet.
  • Files stay small — links, short documents, a few screenshots — so 60 MB is not the bottleneck.
  • The team expects to pay $7 per user per month once Gantt charts, storage and time tracking need to leave the free tier.

What Taskee does not have yet

Taskee is a young product and the honest list of what it does not do is short but real, as of 2 September 2026:

  • No standalone mobile app. The FAQ says it plainly: Taskee is adapted for the mobile browser and can be saved to the home screen, but there is no iOS or Android app.
  • No native connectors. There is a documented REST API with 140 endpoints and a published OpenAPI 3.0 specification, plus CSV export, but no ready-made Slack, Google or Jira integration and no webhooks — see Taskee integrations.
  • No Gantt chart or timeline view.
  • No automation rules.
  • Several features are marked “Soon” on the site — project budgeting, quick tasks, personal projects, custom reports and others. Roadmap is not delivery, and nothing on this page counts them as shipped.

60 MB, measured

Sixty megabytes is not a typo — it is ClickUp Free Forever’s total file storage for the whole workspace, and it fills fast: a handful of full-resolution screenshots, one short screen recording or a couple of PDF exports can use it up. Everything past that either lives outside ClickUp or waits for Unlimited at $7 per user per month billed annually ($10 monthly), which is also where Gantt charts, unlimited integrations and native time tracking begin. Taskee’s ceiling is up to 10 GB, about 170 times more, and it is not rationed per feature.

The trade runs in the other direction too. ClickUp Free still includes 5 Spaces, 40 lists per Space, 3 whiteboards, a form and 100 automation runs across 5 active rules, and its free workspace is not capped by seat count either. A team that wants that breadth and keeps files small gets more tool for $0 from ClickUp than from Taskee.

What ClickUp’s free automation buys

One hundred automation runs a month across five active rules is enough for basic if-this-then-that behaviour: move a task when a status changes, assign it when a tag is added. It is a small allowance, and it is still more than Taskee offers, which is none. A task that needs to move or notify someone in Taskee needs a person, or a script written against the Taskee REST API — 140 endpoints with a published OpenAPI 3.0 specification. That is a workaround for a developer, not a feature for the rest of the team, and this page will not call it equivalent.

The same trade shows up in reporting. ClickUp’s dashboards are trial-only on Free, so a team that wants a live view of workload either pays or watches the trial run out. Taskee’s project, people and time reports ship on the free plan with no trial clock and export to CSV. How the boards work is shown in kanban board; where ClickUp sits among seven options is in Asana alternatives compared. Taskee’s pricing is set out on the Taskee pricing page.

FAQ

How much storage does ClickUp Free include?

60 MB across the entire free workspace — not per file and not per project. File attachments are the only thing that counts against it.

Are Gantt charts free in ClickUp?

No. Gantt charts and dashboards are trial-only on the Free Forever plan; unlimited Gantt charts are listed on Unlimited, at $7 per user per month billed annually.

Does ClickUp include time tracking on the free plan?

No. Native time tracking is listed on the Unlimited plan at $7 per user per month billed annually. In Taskee, time tracking is part of the free product.

How much storage does Taskee give?

Up to 10 GB, roughly 170 times ClickUp Free's 60 MB ceiling, and the number of users is not limited.

Does Taskee have automations?

No. Taskee has zero automation rules, while ClickUp Free includes 100 runs a month across 5 active rules.
scroll to up
Back to menu
Back to menu
For teams
Industries
Company type
See all solutions
See all solutions